HIGHWAYS

CFS Engineers provides premium planning, design, and inspection for all aspects of highway projects. To achieve the best quality for a design project, our team plans and designs for horizontal and vertical alignments, topography constraints, clear zone grading and guardrail protection, traffic signals and roundabouts, signage, pavement markings, and access management. We expertly cover the variety of roadside details for highway projects including landscaping, stormwater flow, erosion control, lighting and fiber, and Intelligent Transportation Systems (ITS).

PROJECTS

155th Street Improvements | Kansas City, Kansas

The design included the reconstruction of 3,500 foot of roadway along 155th Street from Kensington Avenue to the Kansas City Southern Railroad Crossing.  Along with the roadway improvements the project includes the construction of a 10’ Trail with accessible ramps, and a 5’ sidewalk with accessible ramps. The features within the project are: 2-28’ wide divided median roadway sections, 127’ long 6’x6’ box culvert, 26 storm inlets, 3,200 linear feet of storm pipe utility relocations, and 60,000 cubic yards of earthwork.

School Road, Phases I, II, & III | 

Cass County, Missouri

CFS designed and provided construction inspection for this project. The project is from Hubach Hill Road to 195th Street (Phase 1), 195th Street to 203rd Street (Phase 2), and 203rd Street to 211th Street (Phase 3), each project is approximately one mile. The project includes converting an existing 24’ roadway with open ditches to a 24’ urban roadway with curb and gutter and storm sewers.

Route 1 and Parvin Road | Kansas City, Missouri

description

91st Street | De Soto, Kansas

description